KOR | CHN

Environment & Safety

Integrated Disaster Prevention System & Seismic Retrofitting

Foosung Co., Ltd. operates an integrated disaster prevension system and has made extensive preparation for natural disasters (earthquakes, etc.).
In order to maintain stability in production and process management, seismic retrofitting of designated facilities are initiated on a structure-by-structure basis. All employees are well-acquainted with evacuation measures in accordance with the emergency response regulations.

  • 통합방재시스템1
    Downsize storage
    facilities of hazardous
    chemicals
    Arrange provisions
    against natural
    disasters
  • 통합방재시스템2
    Seismic retrofitting of
    older buildings
    Emergency
    evacuation drills
  • 통합방재시스템3
    Structural evaluation of
    chemicals storage
    facilities
    Seismic retrofitting of
    retaining walls around
    workplace borders
  • 통합방재시스템4
    Seismic retrofitting of
    steel-framed plants
통합방재시스템
  • 1

    Construct and operate integrated Disaster Prevention System

  • 2

    Detailed safety inspection and seismic analysis on older buildings

  • 3

    Self-inspection and administration of seismically vulnerable structures.

  • 4

    Seismic retrofit according to seismic analysis result

Earthquake Preparedness and Response Training

Classification Organizational Evaluation Drill Remarks
Schedule Once per year
(during General Health & Safety education regarding emergency situations)
Once per year
(during each plant's emergency drill)
Participant All Ulsan Plant employees (including subcontractors)
Method Education by division group (All-hands educational meeting, when necessary) Response training (personal emergency response instructions, evacuation, damage report procedures, etc.)
Contents
  • 1)

    Self-defense measures during earthquakes

  • 2)

    Emergency measures after earthquake vibration

  • 3)

    Instructions regarding emergency evacuation and assembly

  • 4)

    Damage report procedures

  • 5)

    Accident response and relief work

  • 6)

    Personal Protection Equipments (PPE) Instructions

  • 1)

    Personal emergency response instructions in the event of an earthquake

  • 2)

    Emergency evacuation and damage report training

  • 3)

    Damage prevention and fire extinguishing facilities operation training exercise

  • 4)

    First-aid and casualty transportation training exercise.